
KACO error codes explained
What 53 KACO inverter fault and error codes mean, in plain English, with safe checks you can do and when to call a licensed electrician.
Safety first: never open the switchboard, remove covers, or pull apart or disconnect the inverter, batteries, isolators or wiring. Only use the switches and buttons described here. Anything else must be done by a licensed electrician. Call 1300 209 503 or book a service request.
| Code | Message & meaning |
|---|---|
| OS 1Info |
Waiting for feed-inSelf-test: the grid parameters and solar (generator) voltage are being checked. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 2Warning |
Generator voltage is too lowNot enough solar voltage and power - normal status before the inverter switches off for the night. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 8Info |
Self-testThe inverter is checking its power electronics and grid relay before feeding in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 10Fault |
Temperature in unit too highThe inverter has switched off because it overheated. Possible causes: very high ambient temperature, fan covered, or inverter defective. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 11Info |
Measured values (power limitation)Power limitation: the solar generator power is too high so the inverter limits itself to its maximum power (e.g. around noon). What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 17Fault |
Shutting down Powador-protectThe activated grid and system protection has been tripped. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 18Critical |
Resid. current shutdownResidual current was detected and feed-in was interrupted. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 19Critical |
Insulation faultThere is an insulation fault on the PV generator. The feed-in was interrupted. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 21Fault |
Protective shutdown PV current 1DC current has exceeded the permissible maximum on PV input 1. The inverter shut down to protect itself. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 22Fault |
Protective shutdown PV current 2DC current has exceeded the permissible maximum on PV input 2. The inverter shut down to protect itself. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 23Fault |
Protective shutdown PV current 3DC current has exceeded the permissible maximum on PV input 3. The inverter shut down to protect itself. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 29Critical |
Ground connection check fuseA ground fault was detected at the PV generator. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 32Fault |
Fault self-testThe internal grid separation relay test has failed. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 33Fault |
DC feed-in errorThe DC component fed into the grid has exceeded the permitted value. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 35Fault |
Protection shutdown SWSoftware protective shutdown (AC overvoltage, AC overcurrent, DC link overvoltage, DC overvoltage, DC overtemperature). Grid-related; the inverter reconnects automatically. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 37Fault |
Unknown hardwareHardware was connected that is not compatible with this device or has not been connected properly. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 38Fault |
Generator overvoltage errorThe voltage of the solar (DC) generator is too high - the PV generator is configured incorrectly. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 41Fault |
Line failure: undervoltage L1The voltage on grid phase L1 is too low; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 42Fault |
Line failure: overvoltage L1The voltage on grid phase L1 is too high; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 43Fault |
Line failure: undervoltage L2The voltage on grid phase L2 is too low; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 44Fault |
Line failure: overvoltage L2The voltage on grid phase L2 is too high; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 45Fault |
Line failure: undervoltage L3The voltage on grid phase L3 is too low; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 46Fault |
Line failure: overvoltage L3The voltage on grid phase L3 is too high; the inverter cannot feed in. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 47Fault |
Grid failure phase-to-phase voltageThe measured line-to-line voltage is outside the tolerance limits. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 48Fault |
Line failure underfrequencyGrid frequency is too low. This fault may be grid-related. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 49Fault |
Line failure overfrequencyGrid frequency is too high. This fault may be grid-related. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 50Fault |
Line failure average voltageThe grid voltage measured per EN 50160 has exceeded the maximum permitted limit. This fault may be grid-related. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 56Info |
Switch off via digital inputThe inverter was disconnected from the grid by a remote command (remote trip-off). What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 57Info |
Waiting for reconnectThe inverter is waiting after a fault; it will not switch on again until the country-specific time has passed. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 58Fault |
Overtemperature control cardThe temperature inside the unit was too high. The inverter switches off to prevent damage. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 60Fault |
Generator voltage too highThe inverter won't start feeding in until the solar voltage falls below a set value. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 61Info |
External limit (%)External power limit activated by the system controller; the inverter limits its power. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 63Info |
Measured values P(f)Frequency-dependent power reduction is active (starts at 50.2 Hz). What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| OS 64Info |
Measured values (output current limiting)The AC output current is being limited at its specified maximum. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 70Fault |
Fan errorThe fan is malfunctioning. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 71Fault |
Fan error (external)The external fan is malfunctioning. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 73Fault |
Standalone grid err.Standalone (islanding) mode was detected. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 78Critical |
Resid. current shutdown (AFI)Measured residual (AFI) fault current was above 180 mA; the device switched off immediately. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 80Fault |
Insulation meas. not possibleThe insulation measurement can't be done because the solar voltage is too unsteady. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 81Fault |
Protection shutdown line volt. L1Overvoltage detected on conductor L1; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 82Fault |
Protection shutdown line volt. L2Overvoltage detected on conductor L2; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 83Fault |
Protection shutdown line volt. L3Overvoltage detected on conductor L3; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 84Fault |
Protection shutdown undervolt. DC linkA voltage deviation was found in the internal DC link; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 85Fault |
Protect. shutdown overvolt. DC linkOvervoltage in the internal DC link; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 87Fault |
Protection shutdown overcurrent L1Current on conductor L1 too high; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 88Fault |
Protection shutdown overcurrent L2Current on conductor L2 too high; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 89Fault |
Protection shutdown overcurrent L3Current on conductor L3 too high; an internal protection disconnected the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 91Fault |
Protect. shutdown drop 2.5VInternal 2.5 V reference voltage outside the permissible range. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 92Fault |
Protect. shutdown drop 1.5VInternal 1.5 V reference voltage outside the permissible range. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 97Fault |
Protection shutdown overcurrent HWToo much power was fed into the grid; complete disconnection of the device. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 100Fault |
Protect. shutdown HW overheatingThe device switched off because the temperatures in the housing were too high. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 101-106Fault |
Plausibility error (temperature, efficiency, DC link, AFI module, relay, DC/DC converter)The unit shut down because of implausible internal measured values. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
| FS 108-113Fault |
Critical overvoltage/undervoltage L1-L3Grid voltage is outside the upper limits on the indicated phase. What you can do
blueplanet 5.0-10.0 TL3 three-phase · Guide only. All work must be done by a licensed electrician. |
No codes match. Try fewer characters, or ask us.
Common KACO questions
What does KACO FS 10 "Temperature in unit too high" mean?
The inverter has switched off because it overheated. Possible causes: very high ambient temperature, fan covered, or inverter defective. Check from a safe distance that the inverter is shaded, has clear space around it and that nothing is blocking the vents This is a guide only; any electrical work must be done by a licensed electrician.
What does KACO FS 17 "Shutting down Powador-protect" mean?
The activated grid and system protection has been tripped. This is usually caused by the mains supply, not the solar system This is a guide only; any electrical work must be done by a licensed electrician.
What does KACO FS 21 "Protective shutdown PV current 1" mean?
DC current has exceeded the permissible maximum on PV input 1. The inverter shut down to protect itself. Do not touch the DC isolators or cables This is a guide only; any electrical work must be done by a licensed electrician.
What does KACO FS 22 "Protective shutdown PV current 2" mean?
DC current has exceeded the permissible maximum on PV input 2. The inverter shut down to protect itself. Do not touch the DC isolators or cables This is a guide only; any electrical work must be done by a licensed electrician.
What does KACO FS 23 "Protective shutdown PV current 3" mean?
DC current has exceeded the permissible maximum on PV input 3. The inverter shut down to protect itself. Do not touch the DC isolators or cables This is a guide only; any electrical work must be done by a licensed electrician.
Need help with this fault?
Get a licensed electrician to call you back.
Total Solar can help: our licensed electricians install and service systems. Based in Ellenbrook, WA, with Victoria and Queensland also available.
Or call 1300 209 503
Sources
Meanings are summarised from these manufacturer documents. Check your own model's manual, as codes vary between models and firmware versions.
KACO is a trademark of its owner. Total Solar is not affiliated with the manufacturer unless stated. All fault code guides